Germany – Decommissioning services – Alpha Ventus Decommissioning - WTG scope
Vattenfall
نص الإعلان بلغة المصدر.موضوع العقد
The contract shall include all the required work for the decommissioning of Wind Turbine Generators (WTGs) for the Alpha Ventus Offshore Wind Farm. The scope of work for the decommissioning of 12 WTGs (6x Adwen AD 5-116 and 6x Senvion 5M; 5 MW rated power each) at Alpha Ventus shall comprise: - Offshore dismantling of WTGs (i.e. rotor-nacelle-assemblies and towers) and offshore transport, providing all required vessels, equipment, tools and personnel. - Load-in and onshore handling, providing all required port/harbour facilities and support services. - Onshore processing of WTG components and waste management, providing all temporary storage, transport and facilities until final disposal. In this context disposal includes re-use, recycling and recovery of energy of materials. - Provision of required marking and make safe activities for the remaining foundation structures following WTG removal. - Provision of all required planning documentation and engineering works as well as project management activities for the above decommissioning scope. The works are expected to commence from early 2027 onwards, however we are also considering start dates in 2028.
الشروط الفنية والإدارية
تحقق من جميع الشروط في المستندات الرسمية.
المستندات
التقييم
درجة قائمة على قواعد قابلة للتفسير؛ لا تضمن الأهلية.
—بيانات تحتاج التحقق
تحقق من جميع الشروط في المستندات الرسمية.
آخر موعد: غير مذكور