AADARBROSOPPORTUNITY INTELLIGENCE
← 返回
AU-ATM / AUS已过期 / 已关闭

PSC002905-01: EOI - Supply of Direct Drive Chiller

AusTender Current ATM官方RSS。未提供或核实采购机构、预算及截止日期。请在原公告核实状态、条件及截止时间。并非澳大利亚全部采购。

公告内容使用来源语言。

项目内容

The Australian Synchrotron (AS) is a world-class research facility operated by the Australian Nuclear Science and Technology Organisation (ANSTO) at Clayton, Victoria. The facility operates continuously and relies on a central refrigeration system to provide chilled water for critical facility heat loads, including low-conductivity water (LCW) cooling and HVAC systems. Chiller 1 is one of four chillers serving the primary cooling circuit. It is approximately 22 years old, has accumulated significant run hours and has reached end of life, with spare parts no longer readily available. Replacement is required to restore reliable N+1 cooling redundancy and reduce the risk of loss of critical cooling capacity.

技术和行政条件

请在官方文件中核实所有条件。

来源:Australian Government Department of Finance · AusTender RSS · CC BY 3.0 AU。ADARBROS整理了订阅文本,未转载招标文件。 ↗

AusTender Current ATM官方RSS。未提供或核实采购机构、预算及截止日期。请在原公告核实状态、条件及截止时间。并非澳大利亚全部采购。

文件

评估

可解释的规则评分,不保证投标资格。

—

待核实信息

请在官方文件中核实所有条件。

截止日期: 未提供

公布金额: 未提供