Germany – Decommissioning services – Alpha Ventus Decommissioning - BoP scope

Vattenfall

公告内容使用来源语言。

项目内容

The contract shall include all the required work for the decommissioning of Balance of Plant (BoP) components for the Alpha Ventus Offshore Wind Farm. The scope of work for the BoP decommissioning shall comprise: • Dismantling and transport to shore of all 12 WTG foundations (6 Jackets and 6 Tripods) as well as the OSS Jacket installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. o Option 1: Partial pile removal (mechanical separation of piles and supporting structure). o Option 2: Full pile extraction (additional scope of complete pile removal by Vibrohammer or other extraction method). • Dismantling and transport to shore of the OSS Topside installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. • Cutting and recovery of inter-array cables and related cable protection systems installed within Alpha Ventus OWF and transport to shore, including provision of required vessels, equipment, tools and personnel. • Optional: Cutting the export cable at the offshore substation including wet storage. • Optional: Removal and transport to shore of Scour Protection installed within Alpha Ventus OWF, including provision of required vessels, equipment, tools and personnel. • Provision of required marshalling harbours and other support services. • Onshore processing and disposal/recycling of all components, including temporary storage, logistics and facilities. • All required engineering works and creation of planning documentation. • Pre/post decommissioning surveys (as required) The works are expected to commence from 2027 onwards, however we are also considering start dates in 2028.

技术和行政条件

请在官方文件中核实所有条件。

文件

评估

可解释的规则评分,不保证投标资格。

—

待核实信息

请在官方文件中核实所有条件。

截止日期: 未提供